Railway switches
Insepection with automatic robot
For safe rail traffic, each railway switch must be checked according to the specific regulations/procedures. During the inspection phase, all the data defined in a specific technical instruction is measured, in the manner and position indicated. Our team of qualified technicians carries out the measurements with the CAM - FELIX automated trolley or alternatively with manual tools. For the measurements of the switch, reference is made to the standards and technical instructions of the railway concerned, which also establish the time intervals within which they must be performed. Before proceeding with the survey it will be necessary to check that the switch is clean. If rubbish etc. were present, cleaning will be required to remove everything. The activity must be attended by a manager of the railway line. The measurement team consists of 2 people, a team leader, and an assistant, both for handling and assembly and for the relevant activity. Once the measurement is over, the technicians process the data to deliver the final report, containing all the defects found and the intervention measures to be adopted as required by the regulations.