menu close
Get in touch Locations
railgroup. Safety. Maintenance. Diagnostics.
close contact
Zona artejanala 58 39030 La Valle
Waldberger Straße 24 86399 Bobingen
Rua Brotas, 12 Loja A Bairro Sao Salvador 30881-290 – Belo Horizonte/MG
Hello,
let’s talk.

Fill the form and we'll be in touch shortly.

remove file
Choose a file
Your personal data will exclusively be used to handle your request and will not be passed on to third persons on the legal regulations (GDPR 679/2016, TKG 2003). Holder of data handling is m2 railgroup S.r.l. Zona artejanala, 58 BZ - Italia info@m2railgroup.com. Read the full privacy policy.
Railsafety

Installation stage.

The flexibility of the systems allow different configurations for different worksites

Installation of the system is carried out in accordance with a precise sequence that includes five phases:

  • Preparation of the materials
  • Installation at the worksite
  • Internal testing (M2 S.r.l.)
  • Delivery of materials to the worksite
  • Training/information for employees at the worksite

The system basically consists of:

  • An apparatus that signals when a train is approaching
  • A central processing unit
  • Alarm systems with sound and lights

All the components of the system need to be installed like it is written in the schematic plan, designed during the planning stage. The advantage of these systems is their flexibility. For every type of worksite (fix or mobile, short or long) you can adapt to different configurations.

Our process
More about rail safety
installation stage.
installation stage.