Installation stage.
The flexibility of the systems allow different configurations for different worksites
Installation of the system is carried out in accordance with a precise sequence that includes five phases:
- Preparation of the materials
- Installation at the worksite
- Internal testing (M2 S.r.l.)
- Delivery of materials to the worksite
- Training/information for employees at the worksite
The system basically consists of:
- An apparatus that signals when a train is approaching
- A central processing unit
- Alarm systems with sound and lights
All the components of the system need to be installed like it is written in the schematic plan, designed during the planning stage. The advantage of these systems is their flexibility. For every type of worksite (fix or mobile, short or long) you can adapt to different configurations.